Inspection Form

Print
Press Enter to show all options, press Tab go to next option
               Town of Chapel Hill Logo                              Fire Department Patch               

     TOWN OF CHAPEL HILL
     Fire Department

     403 Martin Luther King Jr. Blvd.
     Chapel Hill, NC 27514-5705

     phone (919) 968-2781 fax (919) 932-2956
     www.townofchapelhill.org

Please correct the field(s) marked in red below:

Date of Request
 *
Requesting this date does not guarantee an inspection will be conducted on this date. An official from the Fire Marshal's office will be in touch with you about scheduling.
Date(s) Seeking Inspection(s)
 *
Date(s) Seeking Inspection(s)

>Submission request for inspection is not a confirmation of an inspection.
>
Confirmation of inspection request will be issued within 24-48 hours of submission request.

Contractor/Company Requesting Inspection(s)
 *
Contractor Representative Requesting Inspection
 *
Phone Number
 *
Email
 *
Address of Inspection(s)
 *
Name of Business
 *
Height of Building(s) (stories)
 *
Square Footage of Inspection Area
 *

Type of Inspection(s) Requested

Fire Sprinkler
Fire Sprinkler
NFPA 24 Underground
NFPA 24 Underground
Fire Sprinkler Above Ground
Fire Alarm
Fire Alarm
Stand-Pipe
Stand-Pipe
Fire Pump
Fire Pump
Alternative Extinguishing System
Alternative Extinguishing System
Underground Storage Tank(s) UST
Underground Storage Tank(s) UST
Other System Type
High Rise Building (>75 top floor)?
 *
High Rise Building (>75 top floor)?

GENERAL REQUIREMENTS

  • All inspection requests for code compliancy require 100% state of readiness (visual, functional)
  • All conditions and requirements of plan review and permit shall be met prior to inspection request
  • All ancillary functions (door releases, dampers, etc…) connected to systems for inspection shall require 100% state of readiness and functionality
  • After 2nd failed inspection all re-inspections incur fee of $75.00 per inspection to be paid prior to scheduling additional tests/inspections
  • No simulated operation(s) shall be allowed or accepted during inspections:
    • Examples:
      • Water must move through pipe for flow switches
      • Valve handle(s) must be turned for tamper switches
  • All device types, locations and functions shall be verified
  • Approved plans, operation manuals, specification sheets, calculations shall on site

SEE INSPECTION CHECKLIST USED BY INSPECTOR FOR BEST PREPERATION 

  1. To receive a copy of your submission, please fill out your email address below and submit.
    CAPTCHA
    Change the CAPTCHA codeSpeak the CAPTCHA code
     
    View Full Site